Progress Reports Advanced Traffic Management Systems Sarasota
Signal Retiming Project (197978 1 32 01): This project is retiming
99 signalized intersections that are currently part of either the City
of Sarasota or Sarasota County's existing closed loop system. All of
the work is complete except for the delivery of the Final Timing Report. Manatee
Signal Retiming Project (196122 1 32 01): This project is retiming
88 signalized intersections that are currently part of either the City
of Bradenton or Manatee County's existing closed loop system. Timing
implementation is underway. City
of Winter Haven Signal Retiming Project (197628 1 32 01): This project
is retiming 26 signalized intersections that are currently part of the
City of Winter Haven's existing closed loop system. A notice to proceed
is scheduled for January 2002. Sarasota-Manatee Traffic Signal Systems Alternatives Analysis (202079 1 12 01): This project will provide cost-benefit information associated with the traffic signal systems in the Sarasota/Manatee area for the following alternatives:
|
The
Final Report is complete. A presentation for the MPO will be scheduled
in the first part of 2002. City
of Naples/Collier County Advanced Transportation Management System (ATMS),
Design Group I, Construction (195403 1 52 01): A Hybrid traffic
control system utilizing fiber optic cable for communications to 77
intersections was let for construction. This is the first of two projects
that are scheduled to construct the ATMS. This project will build the
control centers for the city and county and communicate with 77 intersections.
Construction began in May 2001 and is continuing on-schedule. City
of Punta Gorda/Charlotte County Advanced Transportation Management System,
Design Group I, Construction (193821 1 52 01): A Hybrid traffic
control system utilizing fiber optic cable for communications to 53
intersections was let for construction. This is the first of two projects
that are scheduled to construct the ATMS. This project will build the
control center for the county and communicate with 53 intersections.
Completion of the system is on hold pending the resolution of some items
by the contractor. City
of Naples/Collier County Advanced Transportation Management System,
Design Group II, Design (195403 2 32 01): This project will
expand the signalized signal system to an additional 77 intersections
and install video at 50 locations for monitoring traffic. This is the
second of two projects that were scheduled to construct the ATMS. Design
began in July 2001 and is continuing on-schedule. 30% Plans have been
received. City of Punta Gorda/Charlotte County Advanced Transportation Management System, Design Group II, Design (193824 1 32 01): This project will expand the signalized |
signal
system to an additional 44 intersections and install video at 40 locations
for monitoring traffic. This is the second of two projects that are
scheduled to construct the ATMS. The NTP is scheduled for December 2001. Incident
Management Road
Ranger Service Contract, Lee County (408998 1 72 01): Service
contract for I-75 in Lee County that provides service from Exit 18 to
Exit 23. Road
Ranger Service Contract, Charlotte County/Sarasota County (409000 1
72 01): Service contract for I-75 in Charlotte County and Sarasota
County that provides service from Exit 31 to Exit 37. Road
Ranger Service Contract, Polk County (408999 1 72 01): Service contract
for I-4 in Polk County that provides service from the Hillsborough County
Line to the Osceola County Line. I-75
Incident Management Project Plan for Collier and Lee Counties (202062
1 12 01): This project involves preparation of an incident management
project plan for the I-75 Corridor. An operational concept is developed
identifying the functions of an ITS, the roles and responsibilities
of the agencies involved, and the location and |
|||||||||
|