SunGuide

Link to home page

Inside This Issue

February 2002


Florida Transportation Commission

ITS America 2002

ITS Corridor Master Plans and ITS Program Plan

511 Traveler Information

TMC Software Study

Roadway / Weather Information Systems

Florida Fiber Network

CVO/CVISN

I-4 Corridor Invitation to Negotiate

Training Opportunities

ITS Progress Report
District 1

District 2
District 3
District 4
District 5
District 6
District 7
Turnpike District

Announcements

FDOT ITS Office Contacts

Link to home page

FDOT Logo

Florida Department of Transportation
ITS Office
605 Suwannee Street, MS 90
Tallahassee, Florida 32399-0450
(850) 410-5600

Traffic Management Centers

Broward County ITS Operations Facility (231654-1-52-01)
The Operations Facility is a traffic management center and will serve as the nerve center for ITS projects deployed in Broward County. This will be a showcase facility which will house monitoring and control capabilities for the I-595/I-95 Dynamic Message Sign System, the Freeway Video Monitoring System, the Advanced Traveler Information System, the Broward County ATMS signal system, and the Advance Incident Information System (AIIS). The facility will have two floors. The first floor will house the ITS Operations Center and will be built with federal funds while the second floor will house the Broward County Traffic Engineering offices and will be built using county funds. All current and future Broward County ITS devices will be controlled from this facility and the facility will also provide operation consoles for FHP and Broward County Transit.
Approx. Completion: May 2004
Contact: Valerie Tofexis / SunCom 436-4296

Palm Beach County ITS Operations Facility Master Plan (231930-1-21-01)
The Master Plan will guide facility site acquisition, design, and operation of the Palm Beach County ITS Operations Facility. The Operations Facility is a traffic management center and will serve as the nerve center for ITS projects deployed in Palm Beach County. It will house monitoring and control capabilities for the I-95 Dynamic Message Sign System, the Freeway Video Monitoring System, the Palm Beach County signal system, and the Advanced Traveler Information System. The facility will house the ITS Operations Center and will be built with federal funds. All Palm Beach County ITS devices will be controlled from this facility.
Approx. Completion: May 2002
Contact: Valerie Tofexis / SunCom 436-4296

• • District Five • •


Advanced Traffic Management Systems

Regional Traffic Management Center (RTMC) Upgrade / Retrofit (410725-1-52-01)

 

Upgrade of existing RTMC communications to Gigabit Ethernet with Extreme Switches to support future I-4 SMIS operations and network interfaces with other regional agencies. Includes building modifications.
Approx. Completion: Under Construction
Contact: Ms. Anne Brewer / (386) 943-5319

City of Orlando Regional Computerized Signal System (23945-1-54-01)
JPA with City of Orlando to upgrade the signal system. Includes: fiber, gigabit Ethernet, Extreme Switches and Naztec NTCIP controllers, etc.
Approx. Completion: Under construction
Contact: Ms. Anne Brewer / (386) 943-5319

Seminole County ATMS (404674-1-54-01)
JPA with Seminole County to upgrade the signal system with Gigabit Ethernet, Extreme Switches and Naztec NTCIP controllers, etc.
Approx. Completion: Under construction
Contact: Ms. Anne Brewer / (386) 943-5319

Orange County Computerized Signal System (404675-1-54-01)
LAP Agreement with Orange County to upgrade the signal system.
Approx. Completion: Feasibility and Implementation Study Underway
Contact: Ms. Anne Brewer / (386) 943-5319

Integrate ITS in Volusia County (240948-2-52-01)
Integration of the City of Daytona Beach, Volusia County and FDOT DASH video systems for shared traffic management systems. Includes fiber on I-4, US 92 and county roads and developing an ITS Architecture for Volusia County. Completes the missing fiber link along I-4 from SR 44 to DASH
Approx. Completion: December 2002; Under construction
Contact: Ms. Jennifer Heller / (386) 943-5322

ITS Fiber Optic Deland Maintenance (Pushbutton Contract)
Fiber connection from I-4 to maintenance facility.
Approx. Completion: Under design
Contact: Mr. Scott Silva / (386) 943-5317

 

ITS Fiber Optic Orlando/Oviedo Maintenance
Fiber connection from I-4 to maintenance facility.
Approx. Completion: Unfunded
Contact: Ms. Anne Brewer / (386) 943-5319

ITS Fiber Optic Cocoa Maintenance
Fiber connection from I-95 to maintenance facility.
Approx. Completion: Unfunded
Contact: Ms. Anne Brewer / (386) 943-5319

ITS Fiber Optic Leesburg and Ocala Maintenance
Fiber connection from I-75 to maintenance facility.
Approx. Completion: Unfunded
Contact: Ms. Anne Brewer / (386) 943-5319

Freeway Management Systems

I-4 SMIS
Existing (39 miles) ITS; CCTV, detector stations, DMS from US 192 to Lake Mary Blvd.
Approx. Completion: Completed
Contact: Ms. Anne Brewer / (386) 943-5319

I-4 SMIS (22 Miles) Phase 3 - St. Johns River Bridge Replacement/Reconstruction (242702-1-52-01)
ITS Work Zone Management Project - Extension of existing I-4 SMIS from Lake Mary Blvd. to SR 472 in Volusia County. Includes: 72SM Fiber Optic Communication Network, 19 CCTV, 6 DMS, 30 Detector Stations, and fiber link to District Office to create a remote EOC in DeLand.
Approx. Completion: ITS completed by Summer 2002
Contact: Ms. Anne Brewer / 386-943-5319 or Mr. Scott Silva / (386) 943-5317

I-4 SMIS (7 Miles) Phase 4 / I-4 6-Lane Reconstruction Project (242523-1-52-01)
Extension of existing I-4 SMIS from World Drive to US 27 in Polk County. Includes: 72SM Fiber Optic Network, 8 CCTV, 5 DMS, 16 Detector Stations.
Approx. Completion: Construction begins 2003
Contact: Ms. Anne Brewer / (386) 943-5319

 

Continue

Back to Top


SunGuide Disseminator
12